Goonyella Preventative Culvert Maintenance

The Project

The Aurizon Preventative Culvert Maintenance project was a large-scale drainage preservation program within the Goonyella Rail Network. Aimed at improving drainage efficiency and reducing the risk of track damage, our team provided end-to-end maintenance services for critical culvert assets. By identifying and resolving potential issues before they impacted the network, we have helped Aurizon extend asset life and ensure the long-term reliability of the Goonyella system.
Client
Aurizon
Value
Duration
August 2024 – June 2025
Location
Goonyella Rail Network, Central Queensland
Services
Rail infrastructure maintenance, drainage remediation, and civil earthworks

The Scope

  • Successfully delivered preventative maintenance services across 50 individual sites in the Goonyella network
  • Conducted high-pressure jetting and silt removal to ensure unobstructed water flow through drainage assets
  • Utilised advanced camera inspections to identify structural defects and erosion issues before failure
  • Managed vegetation and debris removal to prevent culvert blockages and improve corridor accessibility
  • Repaired areas of scouring at inlets and outlets to stabilise embankments and prevent track washouts
  • Executed all works ahead of the scheduled completion date through proactive project management
  • Expanded the original project scope to include four additional sites while maintaining strict quality standards
  • Achieved a perfect safety record with zero incidents or injuries recorded across the entire project duration
  • Overcame environmental challenges and wet weather through adaptive problem-solving and flexible scheduling

Other Schwarz Projects

SP1 Red Mountain Formation & Turnout Renewal

Mt Isa Track Renewals Stage 3

Aurizon – Grading Access Roads

Explore all our works

Let's chat about your project

This website uses cookies for analytics and to improve web experience.